Showing posts with label Engineering. Show all posts
Showing posts with label Engineering. Show all posts

Wednesday, February 6, 2013

Lely Astronaut Robotic milking system

http://www.youtube.com/watch?v=8ONf6DxTnos

The main revolutionary feature of the Lely Astronaut A4 cow box is the walkthrough design called the I-flow concept. Allowing the cow to walk straight in and out of the box eliminates any unnecessary obstacles, further reducing the threshold for the cow to enter the cow unit at her own pace. The spacious cow friendly design and positioning of the cow unit, allows for continuous interaction with the rest of the herd and thus eliminating unnecessary stress on the cow.
The Astronaut A4 is set up in a modular concept. A central unit features a central vacuum and cleaning system for up to two cow units. It is self-contained and a configuration with two cow units can span a distance up to thirty metres which ensures much more freedom and space for the positioning of the units in the barn. Due to its modularity, it is a valid option both for family farms of 300,000 litres up to farms that produce well over 10 million litres of milk annually. The Lely Astronaut A4 comes in two models, the Manager and the Operator versions, both with additional options to configure the Astronaut A4 designed to the specific needs of the farmer.
Besides these innovations the new Lely Astronaut A4 is filled with new technology such as a new milk friendly pump transporting the milk to the tank without rotating impellers which can damage the milk. To reduce downtime as much as possible, key wear parts have been changed into easy to replace cartridge systems.
Lely has explicitly refrained from automating the actions of milking itself; instead the company continues to build a system around the cow to make sure that cows like to be milked within a low-threshold system. “Contrary to what seems to be the current market trend, we strongly believe this is the way forward in automating dairy farms in an animal friendly way”, said Alexander van der Lely.
Successful robotic milking is a new style of farm management, where the decisions shift from the farmer to the cow. Farmers can control many factors on an individual cow basis; factors that cannot be controlled in a conventionally milked herd. Through Lely’s dedicated management program for dairy farmers; Lely’s T4C, a quick overview is generated on the performance of the herd, the robotic milking system and the cows that require attention. It allows farmers to focus on the cows that need him/her the most. The T4C management program is now also available on the robot itself and therefore available for management on the spot. It comes with an optional dynamic feeding module (DLM). This system automatically changes feed allocations per cow based on optimum cost benefit ratio to maximize profits.
Like all Lely’s dairy products, the new milking system is available through Lely’s unique dedicated sales and service network, its Lely Center concept with more than 160 facilities covering over twenty countries worldwide.

http://www.lely.com/en/milking/robotic-milkingsystem/astronaut-a4

Tuesday, January 22, 2013

Sears Tower 103rd Floor Glass Balcony, Chicago, Illinois, United States

Image

Image

Image

Image

Image

Image





Sony Xperia Z

https://www.youtube.com/watch?v=gWysHOjl95E

With a razor sharp and super bright 5" Full HD Reality Display, Mobile BRAVIA Engine 2, a 13 megapixel camera with Exmor RS™ for mobile - the world's first image sensor with HDR video for smartphones and a sleek design that resists both water and dust, Xperia Z combines the best of Sony in a smartphone.

Saturday, November 24, 2012

Numero 1 Watch by Oriol Llahona

Image

Spanish designer Oriol Llahona has revealed a new watch concept he calls Numero 1 watch, a bold-faced take on classical timekeeping.  The Numero 1 features a vintage-style leather band that wraps around an enlarged rectangle case.  Inside the case, a digital or analog display rests above a black or white background, both styled in a most minimal fashion.  That offset, over-sized case makes this standard design so stylish, yielding a modernist appeal that we’d love to see on our own wrist.

Image

Saturday, November 10, 2012

Crooked House (Krzywy Domek), Poland



The Krzywy Domek is an irregularly-shaped building in Sopot, Poland. Its name translates in to English as the Crooked House.  The Krzywy Domek was built in 2004. It is approximately 4,000 square meters in size and is part of the Rezydent shopping center.

It was designed by Szotyńscy & Zaleski who were inspired by the fairytale illustrations and drawings of Jan Marcin Szancer and Per Dahlberg. It can be entered from either Monte Cassino or Morska Streets.





Banpo Bridge, Seoul, South Korea

Image

The Banpo Bridge is a major bridge in downtown Seoul over the Han River, South Korea, connecting the Seocho and Yongsan districts. The Banpo Bridge is on top of Jamsu Bridge, forming a "double deck" bridge. During periods of high rainfall, the Jamsu Bridge is designed to submerge as the water level of the river rises, as the lower deck lies close to the waterline. This deck incorporates pedestrian and bicycle paths that provide easy access to the Banpo Hangang Park from the north side of the river. Banpo Bridge is a girder bridge and was completed in 1982.

The Moonlight Rainbow Fountain is the world's longest bridge fountain that set a Guinness World Record with nearly 10,000 LED nozzles that run along both sides that is 1,140m long, shooting out 190 tons of water per minute. Installed in September 2009 on the Banpo Bridge, Seoul mayor Oh Se-hoon praised that the bridge will further beautify the city and showcase Seoul's eco-friendliness, as the water is pumped directly from the river itself and continuously recycled. The bridge has 38 water pumps and 380 nozzles on either side, which draw 190 tons of water per minute from the river 20 meters below the deck, and shoots as far as 43 meters horizontally.





Friday, November 9, 2012

Dynamic Tower, Dubai

Dynamic Tower, Dubai

Dynamic Tower also known as Da Vinci Tower is a planned 420-metre (1,378 ft), 80-floor moving skyscraper in Dubai, United Arab Emirates, designed by architect David Fisher.

Similar to the Suite Vollard completed in 2001 in Brazil, each floor will be able to rotate independently. This will result in a constantly changing shape of the tower. Each floor will rotate a maximum of 6 metres (20 ft) per minute, or one full rotation in 90 minutes.

It will be the world's first prefabricated skyscraper with 40 factory-built modules for each floor. 90% of the tower will be built in a factory and shipped to the construction site. This will allow the entire building to be built in only 22 months. The core of the tower will be built at the construction site. Part of this prefabrication will be the decrease in cost and number of workers (90 at the work site and 600 in the factory instead of 2,000 needed). The total construction time will be over 30% less than a normal skyscraper of the same size. The majority of the workers will be in factories, where it will be much safer. The modules will be preinstalled including kitchen and bathroom fixtures. The core will serve each floor with a special, patented connection for clean water, based on technology used to refuel airplanes in mid-flight.

The entire tower will be powered from wind turbines and solar panels. Enough surplus electricity should be produced to power five other similar sized buildings in the vicinity. The turbines will be located between each of the rotating floors. They could generate up to 1,200,000 kilowatt-hours of energy. The solar panels will be located on the roof and the top of each floor.





Friday, September 28, 2012

"Watch" the Engineering...



hereafter before tying up the watch think about the mechanism...